Questions in this set (54)
This method of costing is considered to be the most realistic method of estimating costs.
Activity based
Which method of pricing minimizes risk the most for the merchandiser?
DDP
Identify the last stage of costing.
Actual
What best describes the term “off-loading” ?
Preparation for sewing
Marker efficiency will NOT be affected by the following:
Fabric color
A good marker must have the following characteristics:- Complete set of patterns - Complete pattern data - Precise, consistent, accurate, and smooth lines
^^ All of the above
Garment style #YZ678 has 12 different pattern pieces and there is a current order for 200 units in multiple sizes. If using the modular method of production, how many bundles will need to be prepared for the sewing room?
200
Garment style #YZ678 has 12 different pattern pieces and there is a current order for 200 units in multiple sizes. If using the progressive method of production, how many bundles will need to be prepared for the sewing room?
12 with margin 0
If the cutting equipment can only accommodate a maximum of 50 layers of fabric at a time, how many lays will the cutting room need to cut an order that needs 120 layers of fabric
Three
Time is a critical component in the development of a perfect production plan. T or F
True
In deciding whether to manufacture a garment overseas or in the US, the CMT portion of labor costs does not need to be separated out since labor is calculated the same way. T or F
False
T or F: The merchandiser's role in costing is secondary therefore it is the manufacturer's responsibility to take the lead in determining the costs of production.
False
If a merchant outsources the purchasing of fabric and trim to the manufacturer, they do not need to be involved with the day-to-day pricing fluctuations in the market for the prices of these materials. T or F
False
T or F: A marker should only try to combine orders for different color fabrics of the same style after a marker has already been maximized for a single color alone.
True
The process of developing a product for the apparel industry should occur in the following order: 1. Product Line Development 2. Market Research 3.Pricing 4. Production Calendar
2314
NAICS - North American Industry Classification System identifies general product lines and items coming through customs by providing a numerical code which are designed to:
Consistently and systematically code and track all economic activity as it crosses US borders from abroad.
Which of the following is NOT a driver of changes in today's apparel industry?
Shopping malls
Which of the following best characterizes the growth of a retailer that purchases a smaller competitor and incorporates the competitor’s business as part of their own?
Horizontal integration
An unexpected cold spell has taken over most of the eastern US in early August catching a city by surprise. ZARA's "continuous production" philosophy is best characterized by which store's actions:
Manager at store B reports demand for jackets and coats during their next daily report to HQ and orders a rush shipment.
The definition of a MARKER
A diagram of precisely arranged pattern pieces for a
specific style and the sizes to be cut from a single spread.
Marker planning/making
process of determining the most efficient layout of
pattern pieces for a specific style, fabric, and distribution
of sizes considering fabric yield and equipment utilization
The definition of Spreading
The process of laying fabric on a table in preparation for
the cutting process
Ply – a single layer of fabric
Spread/Lay – 1 to 300 (may be) plies
Manual Marker Making
Tracing full size patterns on
marker paper or directly on the
top ply of the Spread
• Is a slow, tedious process subject
to errors and inconsistencies and
in general having a low ME
Computerized marker making
Accurate, fast and provide
opportunity for greater pattern
manipulation and high ME
• Fast re-production of markers that
can be printed by Plotting
• New software functionality (ex:
auto markers
What is the purpose of marker planning?
To determine the most efficient combination of sizes and shades for each order and to produce the best fabric yield and equipment utilization
Lay planning
Basis of managing cutting room labor and table space
Spreading and cutting schedules are affected by:
Table length, type of equipment, spread length, spreading time, and cutting time
Perfect marker
Accurate/complete sets of patterns
Complete pattern info
Lines – precise, consistent, accurate + smooth
Sufficient allowance between lines for knife manipulation
Good marker efficiency
Correct width based on fabric correct length based on table constraints
Satisfy cut order plan w least
# of markers
A specification that is written as 12" +/- 2" SPI is an example of:
Garment Measurement tolerance
If the Tolerance on a specific seam for a shirt style is 25" SPI +/- 1", then _________ is acceptable.
24-26"
How much of the fabric is used, and not wasted, is answered by the following:
Fabric efficiency ratio
full package contractors
Source material, develop patterns, CMT (cut make trim), and sometimes also develop products
Laws and regulations in relation to garment label are administered by the following federal government agency:
FTC - federal trade commission
The following labels are mandated by government regulations
Fiber content
Which of the following part of the marker is fixed and cannot be changed no matter how many sizes and quantities need to be accommodated.
Weft
What is the correct term to for all the fabric layers laid on the cutting table in preparation for a marker to be cut for a customer’s garment order?
Lay
Which of the following scenarios best describes apparel industry vertical growth?
A shopping mall chain purchases an online retailer to start building their online capabilities
T or F: Data analytics can be used to help companies keep pace with the rapid turnover of consumer preferences dictated by social media marketing.
True
T or F: RN is a means of identifying manufacturers and required on the labels of all US garment producers.
True
T or F: There is still time to modify customer orders after cut order planning occurs.
False
T or F: The perfect garment measurement specifications that need to be met in order for the garment to pass inspection should be calculated from the pattern.
True
T or F:Advertising/Marketing initiatives drive the merchandising, production schedules and thus the production calendar.
True
T or F:Bill of materials identifies the material/components needed to make a garment.
True
T or F: Tariff is a quantitative limit on imports established by the exporting country or country of origin.
False
T or F: When creating a marker as part of the cut order plan, a computerized marker might be faster but will NOT create a more efficient maker than a human.
False
T or F: If there are leftover quantities, you should try to combine different colors of the same fabric in one marker.
True
TFPIA Requires to Identify
Generic name of fiber content
Manufacturers name or # (RN)-Country of origin (COO)
A good production (sewing) system must have the flexibility to be able to adapt to changes in the following.
Change the style and the volume as needed
Productivity can be measured in the following ways: Duration to Complete Customer Order, Quantity of item/s produced, Time to Make Garment, All of the above
All of the above
It is important and common that the Modular system has the following:
Most operators are multiskilled
A sewing manufacturer that handles lower volumes of higher-end garments with a lot of hand-finished elements would most likely implement the following productions sewing system.
Modular
In prep for the holiday buying szn, several customers have expressed an interest in incr their normal orders 4 garments. Which production sewing method is best setup to utilize incentive-based productivity incr to meet the inc in orders quanitities?
progressive
Which type of plant layout is most likely to have the sewing equipment at the factory organized by the type of sewing operation being performed?
Process layout
Costing is a dynamic multi-step procedure that occurs in multiple stages and has both fixed and variable components. Identify the non-variable expense. : cut make trim, import duties, markup