Questions in this set (68)
How does a tied-back soldier pile wall compare to horizontal drains in terms of landslide stabilization?
It provides a higher factor of safety and probability of permanent stabilization
What is the primary factor determining the scope of a site investigation for a landslide?
The size and complexity of the landslide under study
What is the purpose of the preliminary phase in a site investigation for a medium to large landslide?
To include the site visit, information collection, and planning of a study program
What factors should a geotechnical engineer consider when providing a solution to a landslide?
Technical benefits, cost, constructibility, environmental constraints, property ownership, and public safety
What is the first consideration in determining an appropriate remediation for a landslide?
Understanding the cause of the landslide
Why are field investigations and laboratory tests necessary in landslide studies?
To determine an appropriate remediation for a landslide
How do horizontal drains function in landslide mitigation?
They draw down the groundwater profile to increase the factor of safety
How do the costs of landslide studies typically compare to construction costs for remediation?
They can be a relatively high percentage of the construction cost
How many people are generally recommended to participate in a landslide site visit?
Two people
What type of paper is recommended for use during landslide site reconnaissance?
"Write in the rain" paper
What is the primary reason for having two people participate in a landslide site visit?
To take field measurements more accurately and provide safety
What is the first step in creating a site plan for a landslide?
Establish a baseline on or adjacent to the landslide
What is the typical duration of a site visit for a small landslide according to the text?
Two to three hours
What is a limitation of current landslide investigation practices mentioned in the text?
Most of the information that could have been obtained is never taken
Why is it important to consider access for future explorations during a landslide site visit?
To facilitate further investigations and monitoring of the landslide
How can the baseline for a landslide site plan be marked?
With plastic cones, wood stakes, stones, or chalk marks
How does the accuracy of graphical construction for height measurement change as the angle A1DB1 (Figure 3.4) becomes more acute?
The accuracy decreases
What information is not required in the equation to calculate slope height when using the method shown in Figure 3.4?
The height of the observer's eye
How does the tangent of the slope angle relate to percent slope?
The tangent of the slope angle is the same as percent slope.
Why is it important to measure rather than estimate the height of steep slopes?
To avoid significant underestimation of actual height
When measuring a cut height on the uphill side of sloping ground, what direction might the line of sight to the bottom of the slope be?
Down (below the horizontal)
What was the actual measured height of the cliff in Case History 12?
122 feet
Why is it recommended to tape the horizontal distance rather than pace it when measuring slopes?
To ensure greater accuracy in measurements
What is a potential safety concern when taking slope measurements from the middle of a road?
Traffic hazards
What instrument is used to measure both angles and percent slope in the field?
A handheld clinometer
How many observer positions were used to measure the steep cliff in Case History 12?
Three observer positions
What is the purpose of offset measurements from baseline stations?
To map the curvature of the road in plan
Why is it important for project engineers to prepare their own preliminary plan and section of a landslide site?
It provides firsthand knowledge and timely information about landslide conditions
What is the recommended interval for marking stations along the baseline in the example?
25-foot intervals
What advantage does a project engineer's preliminary plan provide over a professional survey?
It provides firsthand knowledge of landslide conditions in a timely manner
How is the arbitrary datum level established in the example landslide site plan?
An elevation of 100.0 feet is assigned to point A at the mid-length of the baseline
How do surveyors' maps typically compare to site reconnaissance plans prepared by project engineers?
There is usually very good agreement between the two
Why do many landslide practitioners avoid making detailed field measurements?
They assume a professional surveyor will be hired eventually
What are three tools mentioned for taking downslope level readings?
Hand level, theodolite with survey rod, and tape with clinometer
What instrument is used by the observer to read the top and bottom of the slope?
Clinometer
What is the maximum distance the Impulse LR laser ranging instrument can measure?
1880 feet (575 m)
When can the cos θ be omitted from the equations for calculating slope height?
When the angle θ is less than 10°
What should be done when the observer at A is reading uphill to the bottom of the slope C?
Enter negative values in the equations for b2 or tan β2
What is a recently-developed tool for measuring slopes mentioned in the document?
Hand-held laser ranging instrument
Why might it be necessary to determine the length X2 from the intersection of two lower lines of sight?
When it is impossible to reach the base of the slope or cliff
How does the Bushnell laser ranging instrument differ from the Impulse LR?
It is simpler, less expensive, and measures distances of 20-400 yards
How many main methods are presented in the document for calculating slope height?
Two methods: angles to horizontal method and percent slope method
What should be understood at the conclusion of the general site investigation?
The causation of the landslide
What is the most important requirement of the general site investigation phase?
To put a line of borings through the center of the landslide
What is a potential objective of the third phase (specific) site investigation?
To provide more details of the subsurface conditions for the selected remedial solution
Why are photographs considered useful in landslide investigations?
They are especially useful if the landslide debris has been removed
What information should be obtained during the data collection phase of a preliminary site investigation?
Previous site investigation reports, past construction activities, topographic plans, aerial photos, regional geology maps, and relevant correspondence
What are the three phases of landslide investigation mentioned in the text?
Preliminary, general, and specific
What criticism does the author make regarding some geotechnical practitioners' approach to preliminary site reconnaissance?
The casual manner in which it is often conducted
How many additional lines of borings may be needed in wide landslides?
One or two additional lines
Why is the site visit considered the most important part of the preliminary work?
It provides the opportunity to obtain photographs and descriptions of the conditions before they are changed
What should be included with old site investigation reports to ensure their value?
Pullout maps, oversize drawings, tables, boring logs, and laboratory data
How does a two-person team typically conduct slope profiling?
By holding a cloth tape at hand or chest level and using a clinometer to measure slope angles
How do one-person step measurements compare to professional surveying in terms of accuracy?
They generally show very good agreement
What is the recommended alternative to using a wide angle lens for capturing a panoramic view of a landslide?
Taking multiple photographs
What is a potential drawback of using a very wide angle lens when photographing landslides?
The observed features become very distorted, especially at the edges of the photograph
What is a key advantage of using GPS handheld instruments for landslide measurement?
They have very good accuracy and are especially useful for larger landslides
What is the primary purpose of using a hand level in the one-person survey method for slope profiling?
To determine when the ground level of the previous stake is at eye level
Why might it be advisable to set out traverse lines in advance when surveying a landslide?
To have workers cut a path through dense undergrowth
What should be included when taking photographs of a landslide site?
Panoramic views, close-ups of important features, and typical exposures of soil and rock
What is the measurement range of the range finder described in the text?
20-400 yards
What valuable information does a measured cross-section provide to the project engineer/geologist?
A "feel" for the site that is difficult to experience with only topographic maps
Why is measuring a cross-section along the direction of landsliding considered potentially dangerous?
The work involves personal risk due to unstable ground conditions
How does the text suggest mapping wide landslides compared to narrow ones?
Several traverses may be needed to provide a good site plan
What is the recommended approach for mapping a long, narrow landslide?
One traverse through the center should be sufficient
How can a geotechnical practitioner use a range finder and clinometer in landslide assessment?
To measure the distance to breaks in slope, trees, houses, or other objects on a landslide
What is the horizontal to vertical (H:V) ratio for a slope with an angle of 35 degrees?
1.43:1
How can the angle of repose of a dry talus slope be determined using the methods described in the text?
By measuring the top and base of the slope and calculating the angle